History

Milestones

From one trade line in 2008 to a full chain of cold rolling, hot rolling, finishing and processing — every expansion driven by customer demand.

Key Milestones

2008

Company Established

Founded in the Chao'an Economic Development Zone, Chaozhou, Guangdong, starting with stainless steel trading and serving local hardware, kitchenware and architectural decoration customers.

2012

First cold rolling line commissioned

Moved from trading to manufacturing, gained in-house production of 2B / BA cold rolled coils, and began taking direct export orders.

2016

International Trade Department established

First orders shipped to the Philippines and Vietnam, building a Southeast Asia sales and service network, with export processes and documentation systems in place.

2019

Hot rolling and finishing lines commissioned

Added hot rolled coil, plate and circle capacity, forming a full-form supply of "coil — plate — circle", with lines increased to 8.

2022

Passed ISO 9001 certification

Quality and documentation systems meet EN 10088 / ASTM A240 export standards for Europe and Middle East markets.

2025

Annual integrated capacity 2 million tons

12 production lines at full load, 30,000㎡ plant area, products exported to 60+ countries and regions.

Scale changes

2008 YearStarted with trade
2012 YearFirst cold rolling line
8 LinesNumber of production lines in 2019
12 LinesNumber of production lines in 2025

Expansion order isn't "big then full"—it pushes forward by what customers wait on longest: first lead time (in-house cold rolling), then form (hot rolling and finishing), last capacity (thin-gauge scheduling).

The judgment behind each node

  • 2012 in-house cold rolling line: the biggest constraint in trading was uncontrollable lead times and surface quality; only after building our own line did our promises have a basis
  • 2016 international trade department established: exports need dedicated staff for standards, inspection and documentation; part-time work cannot build a system
  • 2019: Added hot rolling and finishing—customers prefer full-package purchasing, so single-form suppliers struggle to join main project shortlists
  • 2022: Added system certifications—entering Europe and the Middle East requires documentation systems to meet standards first
  • 2025: Capacity raised to 2 million tons—new capacity mainly shortens scheduling waits for thin specs and custom parts
UGB Line Expansion Milestones
2019: Hot rolling and finishing lines commissioned, enabling full-form supply

Learn More

Need a quote or technical support?

Tell us material, specs, quantity, and destination port; we reply with FOB / CIF quotes within 24 hours.

Added to quote list